Violation Detail
Standard Cited: 19100269 D02 III Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1102415.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 04/26/2016
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/13/2016
Gravity: 10
Report ID: 0418200
Contest Date: 05/16/2016
Final Order: 03/31/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/31/2017 | $0.00 | 06/13/2016 | Serious | |
Penalty | C: Contested | 05/20/2016 | $7,000.00 | 06/13/2016 | Serious | |
Penalty | Z: Issued | 04/26/2016 | $7,000.00 | 06/13/2016 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.269(d)(2)(iii): Procedures shall be developed, documented, and used for the control of potentially hazardous energy covered by paragraph (d) of this section. a. Plant Bowen, JBR 3/4 Building, Buss B - The Georgia Power clearance procedure used to isolate Frames 1 and 1A did not isolate all sources of power thereby exposing employees and subcontractors to the hazard of arc flash/blast and shock.