Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1083559.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 12/07/2015 2
Initial Penalty: $1,200.00
Current Penalty: $700.00
Issuance Date: 11/24/2015
Nr Instances: 2
Nr Exposed: 6
Related Event Code (REC):
Gravity: 1
Report ID: 0316100
Contest Date:
Final Order: 12/14/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/14/2015 | $700.00 | 12/07/2015 | Serious | |
Penalty | Z: Issued | 11/24/2015 | $1,200.00 | 12/07/2015 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) Service Bay No. 1 - On or about 08/07/2015, a 14 gauge, orange extension cord was attached to the building's concrete block wall by means of metal conduit clips. b) Storage Room - On or about 08/07/2015, a 14 gauge, orange extension cord was attached to the building's ceiling joists by means of nails. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).