Violation Detail
Standard Cited: 19100036 C01 Design and construction requirements for exit routes.
Inspection Nr: 1077446.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,500.00
Current Penalty: $2,100.00
Issuance Date: 01/19/2016
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 02/05/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/05/2016 | $2,100.00 | Serious | ||
Penalty | Z: Issued | 01/19/2016 | $3,500.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.36(c)(1): Each exit discharge did not lead directly outside or to a street, walkway, refuge area, public way, or open space with access to the outside: A. On or about July 20, 2015, Tank Fill Area, East side of the building: Since no tank deliveries were being made, the security gates to the tank fill area had been locked. Employees escaping from a hazard within the building would be trapped in the area.