Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1051239.015
Citation: 01002A
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $6,930.00
Current Penalty: $0.00
Issuance Date: 09/09/2015
Nr Instances: 1
Nr Exposed: 8
Abatement Date:
Gravity:
Report ID: 0215600
Contest Date: 10/02/2015
Final Order: 04/25/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 04/25/2016 | $0.00 | Other | ||
| Penalty | C: Contested | 10/07/2015 | $6,930.00 | Serious | ||
| Penalty | Z: Issued | 09/09/2015 | $6,930.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: (a) 69th Street - The second exit out of the building was marked 'Not An Exit' and was locked; 04/02/15. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $ 1,000.00 AS PER 29 CFR 1903.19.
Translate