Violation Detail
Standard Cited: 19100269 L01 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1040868.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 08/12/2015 4
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 08/11/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 09/11/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/11/2015 | $4,200.00 | 08/12/2015 | Serious | |
Penalty | Z: Issued | 08/11/2015 | $7,000.00 | 08/12/2015 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.269(l)(1)(ii): Unqualified employees were allowed to work in areas containing unguarded, uninsulated energized lines or parts of equipment operating at 50 volts or more. On or about February 13, 2015, at an overhead powerline replacement site near Muldrow, OK, the employer did not ensure an employee was qualified to work on unguarded, uninsulated energized lines and parts of equipment. The employee was exposed to the hazard of electrical shock.