Violation Detail
Standard Cited: 19260251 B01 Rigging equipment for material handling.
Inspection Nr: 1031127.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,300.00
Current Penalty: $6,200.00
Issuance Date: 07/22/2015
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 08/06/2015
Gravity: 10
Report ID: 0626700
Contest Date: 08/18/2015
Final Order: 02/22/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/22/2017 | $6,200.00 | 08/06/2015 | Serious | |
Penalty | C: Contested | 08/18/2015 | $6,300.00 | 08/06/2015 | Serious | |
Penalty | Z: Issued | 07/22/2015 | $6,300.00 | 08/06/2015 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.251(b)(1): Welded alloy steel chain slings did not have permanently affixed durable identification stating size, grade, rated capacity, and sling manufacturer: On Gulfview Dr., Richmond, TX, on February 7, 2015, and at times prior thereto, employees used alloy steel chain slings without any identification affixed. A sling failed during lifting operations.