Violation Detail
Standard Cited: 19100179 J02 IV Overhead and gantry cranes.
Inspection Nr: 1019820.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 07/10/2015 2
Initial Penalty: $1,600.00
Current Penalty: $1,600.00
Issuance Date: 06/08/2015
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0830500
Contest Date:
Final Order: 07/02/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 06/08/2015 | $1,600.00 | 07/10/2015 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.179(j)(2)(iv): Monthly inspections of hoist chains, with signed reports, were not performed: (a) Byers Industries, Inc. at 810 S. Sherman St., Longmont, CO 80501: On and before January 14, 2015, the employer did not ensure that all hoist chains associated with the 1-Ton and 2-Ton cranes in the production area had signed monthly inspection reports. The condition exposed employees to the hazard of being struck by heavy loads.