Violation Detail
Standard Cited: 19100037 B04 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1014956.015
Citation: 01002A
Citation Type: Other
Abatement Date: 04/05/2017 2
Initial Penalty: $5,000.00
Current Penalty: $1,500.00
Issuance Date: 06/15/2015
Nr Instances: 1
Nr Exposed: 200
Related Event Code (REC): R
Gravity:
Report ID: 0317300
Contest Date: 07/01/2015
Final Order: 04/05/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/05/2017 | $1,500.00 | 04/05/2017 | Other | |
Penalty | C: Contested | 07/01/2015 | $5,000.00 | 07/02/2015 | Serious | |
Penalty | Z: Issued | 06/15/2015 | $5,000.00 | 07/02/2015 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.37(b)(4): Signs were not posted along the exit access indicating the direction of travel to the nearest exit and exit discharge when the direction of travel to the exit or exit discharge was not immediately apparent: a) Allen Harim Harbeson Plant, Harbeson, DE, Deboning I - On or about 5/21/15, the employer did not post signs indicating the direction of travel to the nearest exit and exit discharge where exit routes were not apparent and exit signs were not visible. Note: Pursuant to 29 CFR 1903.19, the employer must submit abatement certification, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.