Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 989230.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $2,550.00
Current Penalty: $1,000.00
Issuance Date: 12/03/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/04/2015
Gravity:
Report ID: 0418300
Contest Date: 12/29/2014
Final Order: 05/20/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/20/2015 | $1,000.00 | 06/04/2015 | Other | |
Penalty | C: Contested | 01/05/2015 | $2,550.00 | 12/11/2014 | Serious | |
Penalty | Z: Issued | 12/03/2014 | $2,550.00 | 12/11/2014 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.303(c)(3)(i): All splices and joints and the free ends of the conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose. (a) On or about 10/05/2014 - Eagle 1600 Progressive Press System, a 110 volt extension cord was not adequately spliced.