Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 988715.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,500.00
Current Penalty: $3,020.00
Issuance Date: 01/30/2015
Nr Instances: 1
Nr Exposed: 45
Abatement Date: 04/05/2015
Gravity: 5
Report ID: 0111100
Contest Date: 02/12/2015
Final Order: 06/16/2016
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/16/2016 | $3,020.00 | 04/05/2015 | Serious | |
Penalty | C: Contested | 02/13/2015 | $5,500.00 | 04/05/2015 | Serious | |
Penalty | Z: Issued | 01/30/2015 | $5,500.00 | 04/05/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected: Nonwoven Lines - Periodic inspections of the nonwoven lines did not include a representative number of observed employees. The last two inspection cycles of the nonwoven lines included approximately 352 observations. The same employee was observed in all but two observations. The nonwoven department has approximately 45 operators.