Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 979830.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,100.00
Current Penalty: $3,570.00
Issuance Date: 08/07/2014
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 09/12/2014
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 09/09/2014
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/09/2014 | $3,570.00 | 09/12/2014 | Serious | |
Penalty | Z: Issued | 08/07/2014 | $5,100.00 | 09/12/2014 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Periodic inspections were not being performed prior to an injury that took place on 5/20/2014.