Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 975847.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $3,500.00
Issuance Date: 07/01/2014
Nr Instances: 2
Nr Exposed: 6
Abatement Date: 08/06/2014
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 07/24/2014
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection | 
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/24/2014 | $3,500.00 | 08/06/2014 | Serious | |
| Penalty | Z: Issued | 07/01/2014 | $7,000.00 | 08/06/2014 | Serious | 
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): a. On or about May 7, 2011, the employer failed to ensure employees operating winder number 12 were protected against accidental contact with the pulley system while working near the pulleys. b. On or about May 7, 2011, the employer failed to ensure employees operating winder number 8 were protected against accidental contact with the pulley system while working near the pulleys.
Translate