Violation Detail
Standard Cited: 19100305 A02 XI Wiring methods, components, and equipment for general use.
Inspection Nr: 960768.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $3,400.00
Current Penalty: $3,400.00
Issuance Date: 06/26/2014
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/22/2014
Gravity:
Report ID: 0627500
Contest Date:
Final Order: 07/21/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/21/2014 | $3,400.00 | 07/22/2014 | Other | |
| Penalty | Z: Issued | 06/26/2014 | $3,400.00 | 07/02/2014 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.305(a)(2)(xi): Cable assemblies and flexible cords and cables were not supported in place at intervals that ensure that they will be protected from physical damage: Rig #759: on or about February 25, 2014, 480 volt conductors from the tray to the drill water pump #2 were not supported adequately to protect against physical damage.