Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 950303.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,300.00
Current Penalty: $3,780.00
Issuance Date: 03/19/2014
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 04/19/2014
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 04/11/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/11/2014 | $3,780.00 | 04/19/2014 | Serious | |
| Penalty | Z: Issued | 03/19/2014 | $6,300.00 | 04/19/2014 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy: a) The procedures did not describe how to turn off and bleed the hydraulic pump for the General Hone horizontal honing machine PH-13(part numberGH210-25-25, unknown serial number).