Violation Detail
Standard Cited: 19100217 C01 I Mechanical power presses.
Inspection Nr: 939747.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,000.00
Current Penalty: $1,200.00
Issuance Date: 12/04/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/10/2013
Gravity: 5
Report ID: 0111500
Contest Date:
Final Order: 12/19/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/19/2013 | $1,200.00 | 12/10/2013 | Serious | |
| Penalty | Z: Issued | 12/04/2013 | $2,000.00 | 12/10/2013 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.217(c)(1)(i): The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press. Workplace: The Minster 60 ton partial revolution mechanical power press serial # 27856 was not equipped with a point of operation safe guard or device.
Translate