Violation Detail
Standard Cited: 19100119 E03 III Process safety management of highly hazardous chemicals.
Inspection Nr: 92578.015
Citation: 01002
Citation Type: Other
Abatement Date: 02/09/2012 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 12/27/2011
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0524530
Contest Date: 01/18/2012
Final Order: 04/22/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/25/2013 | $7,000.00 | 02/09/2012 | Other | |
Penalty | C: Contested | 03/08/2012 | $7,000.00 | 02/09/2012 | Serious | |
Penalty | Z: Issued | 12/27/2011 | $7,000.00 | 02/09/2012 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(e)(3)(iii): The process hazard analysis did not address engineering and administrative controls applicable to the hazards: The employers 9/19/2008 process hazard analysis identified the following hazards without completing appropriate methodology to address engineering and administrative controls on the PHAWorks format in the form of safeguards, risk assessment values, layers of protection analysis, recommendations, and comments: (a) Node 6 - Primary Column Bottoms Heat Exchange Train, Cause 3 - Manual block valve inadvertently closed on one exchanger. (b) Node 6 - Primary Column Bottoms Heat Exchange Train, Cause 6 - All furnace passes fail open. (c) Node 6 - Primary Column Bottoms Heat Exchange Train, Cause 8 - Loss of flow through an exchanger. (d) Node 6 - Primary Column Bottoms Heat Exchange Train, Cause 11 - Exchanger inadvertently bypassed. (e) Node 6 - Primary Column Bottoms Heat Exchange Train, Cause 16 - Loss of steam. (f) Node 6 - Primary Column Bottoms Heat Exchange Train, Cause 17 - Loss of electricity. (g) Node 6 - Primary Column Bottoms Heat Exchange Train, Cause 27 - Pump seal failure from various causes, such as loss of lubrication, improper assembly, manufacturers defect, etc. (h) Node 8 - Secondary Column, Cause 2 - Malfunction of closed LV1183. (i) Node 8 - Secondary Column, Cause 8 - Malfunction open LV1234A. (j) Node 8 - Secondary Column, Cause 9 - Malfunction open LV1234B. (k) Node 8 - Secondary Column, Cause 10 - Malfunction open of LV1183. (l) Node 8 - Secondary Column, Cause 11 - Malfunction open of FV1193A. (m) Node 8 - Secondary Column, Cause 12 - Malfunction open of FV1193B. (n) Node 8 - Secondary Column, Cause 15 - High reflux flow rates. (o) Node 8 - Secondary Column, Cause 16 - Excess cooling of reflux streams. (p) Node 8 - Secondary Column, Cause 25 - Loss of cooling on the tops reflux. (q) Node 8 - Secondary Column, Cause 31 - Loss of steam. (r) Node 8 - Secondary Column, Cause 32 - Loss of electricity. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).