Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 912395.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,100.00
Current Penalty: $1,260.00
Issuance Date: 06/25/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 1
Report ID: 0419400
Contest Date:
Final Order: 07/18/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/18/2013 | $1,260.00 | Serious | ||
Penalty | Z: Issued | 06/25/2013 | $2,100.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.37(a)(3): Exit routes must be free and unobstructed. No materials or equipment may be placed, either permanently or temporarily, within the exit route: (a) Stairs leading to the production office - On or about June 04, 2013 boxes of ink was stored on the landing, an exit route from the production office