Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 909893.015
Citation: 01002
Citation Type: Serious
Abatement Date: 08/21/2013 2
Initial Penalty: $4,208.00
Current Penalty: $2,524.00
Issuance Date: 08/07/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0830600
Contest Date:
Final Order: 09/11/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/11/2013 | $2,524.00 | 08/21/2013 | Serious | |
Penalty | Z: Issued | 08/07/2013 | $4,208.00 | 08/21/2013 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: a) On or about June 4, 2013 and times prior, employees were exposed to injuries from unguarded equipment at the following location: 1) Nail pointer where product placed is into the hammer; unit located on the shop floor. Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet").