Violation Detail
Standard Cited: 19260600 A06 I Equipment.
Inspection Nr: 907856.015
Citation: 01002
Citation Type: Other
Abatement Date: 09/20/2013 2
Initial Penalty: $6,300.00
Current Penalty: $3,780.00
Issuance Date: 09/13/2013
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): C
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 10/17/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/17/2013 | $3,780.00 | 09/20/2013 | Other | |
Penalty | Z: Issued | 09/13/2013 | $6,300.00 | 09/20/2013 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.600(a)(6)(i): For lines rated 50kv or below, a minimum of 10 feet was not maintained between the energized line and the equipment. On or about May 08, 2013, and at times prior thereto, and thereafter the general contractor on site did not ensure that raised equipment was kept at least 10 feet away from overhead power lines, exposing the equipment operators and pedestrians to the hazards of electrical shock.