Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 899225.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 09/11/2013
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 10/07/2013
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 09/30/2013
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/30/2013 | $7,000.00 | 10/07/2013 | Serious | |
| Penalty | Z: Issued | 09/11/2013 | $7,000.00 | 10/07/2013 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a. Entire facility - On or about April 4, 2013, the employer had not conducted periodic inspections of established energy control procedures in place for employees who perform servicing and maintenance on such equipment including, but not limited to, conveyors and mixers. Employees were thereby exposed to the hazards associated with the unexpected energization of equipment.