Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 899219.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,550.00
Current Penalty: $1,785.00
Issuance Date: 06/27/2013
Nr Instances: 3
Nr Exposed: 11
Abatement Date:
Gravity: 1
Report ID: 0521100
Contest Date:
Final Order: 07/23/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/23/2013 | $1,785.00 | Serious | ||
| Penalty | Z: Issued | 06/27/2013 | $2,550.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: (a) An unguarded projecting shaft projected more than one half the diameter of the shaft on the Crack Corn Cleaner in the Pet and Wild Bird facility. (b) An unguarded projecting shaft projected more than one half the diameter of the shaft on the hammer mill machines in the pellet extrusion facility. (c) An unguarded projecting shaft projected more than one half the diameter of the shaft on the bottom of elevator leg 59. NO ABATEMENT CERTIFICATION OR DOCUMENTATION REQUIRED
Translate