Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100036 H03 Design and construction requirements for exit routes.

Inspection Nr: 898505.015

Citation: 01002

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $7,000.00

Current Penalty: $3,500.00

Issuance Date: 09/06/2013

Nr Instances: 1

Nr Exposed: 100

Abatement Date: 10/02/2013

Gravity: 10

Report ID: 0521700

Contest Date:

Final Order: 09/13/2013

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 09/13/2013 $3,500.00 10/02/2013 Serious  
Penalty Z: Issued 09/06/2013 $7,000.00 10/02/2013 Serious  

Text For Citation: 01 Item/Group: 002 Hazard:

29 CFR 1910.36(h)(3): The outdoor exit route must be reasonably straight and have smooth, solid, substantially level walkways; a. On or about August 29, 2013, near the powder coating cabinet line, the exit route from the building was not smooth, solid or level exposing employees to hazards of not being able to exit the building. The exit route from the building consisted of uneven and broken scraps of wood.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.