Violation Detail
Standard Cited: 19260451 G01 VII General requirements.
This violation item has been deleted.
Inspection Nr: 888003.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $4,900.00
Current Penalty: $0.00
Issuance Date: 07/25/2013
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 08/02/2013
Gravity: 10
Report ID: 0317000
Contest Date: 08/16/2013
Final Order: 10/25/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/25/2013 | $0.00 | 08/02/2013 | Serious | |
| Penalty | C: Contested | 08/27/2013 | $4,900.00 | 08/02/2013 | Serious | |
| Penalty | Z: Issued | 07/25/2013 | $4,900.00 | 08/02/2013 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. b) Jobsite - 300 Hunting Park Ave, Philadelphia, PA - Employees installing trusses were standing on the rail sections of the Scissors Lift thus exposed to fall hazards of approximately 10 feet without the use of fall protection. On or about 1/28/13. Note: Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Translate