Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 790121.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 05/31/2013
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/26/2013
Gravity: 10
Report ID: 0215800
Contest Date:
Final Order: 06/25/2013
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/25/2013 | $7,000.00 | 06/26/2013 | Serious | |
| Penalty | Z: Issued | 05/31/2013 | $7,000.00 | 06/26/2013 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) On or about 12/14/2012, In the foundry: While performing maintenance work on the Inliner machine, all of the energy sources, such as Potential Energy from the raised "spider" and cylinder were not controlled. Abatement documentation is required for this item.