Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 604418.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $7,000.00
Current Penalty: $3,500.00
Issuance Date: 10/25/2012
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): I;R
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 11/14/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/14/2012 | $3,500.00 | Serious | ||
Penalty | Z: Issued | 10/25/2012 | $7,000.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d)(6): Verification of isolation. Prior to starting work on machines or equipment that have been locked out or tagged out, the authorized employee shall verify that isolation and deenergization of the machine or equipment have been accomplished. Tank 2400 - On or about September 23, 2012, The employer did not effectively verify that all energy sources was isolated to the 2400 disconnect box. Thereby exposing employees to energized electrical parts.