Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 467062.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $2,800.00
Current Penalty: $2,800.00
Issuance Date: 06/19/2012
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/22/2012
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order: 07/13/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 06/19/2012 | $2,800.00 | 06/22/2012 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6). Note: Specify distances as indicated in table in paragraph (f)(6) of this section. At the job site located at 51 Eager Road, Webster Groves, on 5 June 2012, the employer did not ensure the ladder jack scaffold was placed far enough away from the energized power line or that the power line had been deenergized or covered and insulated to prevent accidental contact. As a result the employee used the scaffold while exposed to the energized electrical power line. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).