Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 457893.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 08/17/2012
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/10/2012
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 09/14/2012
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 08/17/2012 | $2,000.00 | 09/10/2012 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): On or about June 6, 2012 employees used the Wysong Shear and the Pexto Shear to cut material. The shears are not guarded exposing employees to an amputation hazard. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).