Violation Detail
Standard Cited: 19100119 D03 I D Process safety management of highly hazardous chemicals.
Inspection Nr: 329260.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $6,550.00
Issuance Date: 09/18/2012
Nr Instances: 6
Nr Exposed: 78
Abatement Date: 10/02/2012
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 10/08/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/08/2012 | $6,550.00 | 10/02/2012 | Serious | |
| Penalty | Z: Issued | 09/18/2012 | $7,000.00 | 10/02/2012 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(d)(3)(i)(D): The employer does not include the information pertaining to the equipment in the process including the relief system design and design basis: The employer's process safety information does not include complete design calculations for the following pressure vessels and relief valves within the Vinyl Chloride Monomer Unit: a) The exchanger at the VCM Dryer (West) PSV-E7204A-B and PSV-E7204B-B b) The Refrigerant Storage Drum PSV-V7212A-A and A-B c) The exchanger at the EDC Steam Pre-Heater PSV-E7213A-A d) The exchanger at the EDC Steam Pre-Heater PSV-E7213A-A e) The Stripper Condenser PSV-E7403 f) The Quench Recirculation Cooler PSV-E7411-1
Translate