Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 317378966
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $5,400.00
Current Penalty: $1,200.00
Issuance Date: 07/01/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/05/2014
Gravity:
Report ID: 1055360
Contest Date: 07/23/2014
Final Order: 09/17/2014
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Y: State Decision | 09/17/2014 | $1,200.00 | 06/05/2014 | Serious | |
| Penalty | Z: Issued | 07/01/2014 | $5,400.00 | 06/05/2014 | Repeat |
Translate