Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 317317071
Citation: 01002
Citation Type: Repeat
Abatement Status: X
Initial Penalty: $5,400.00
Current Penalty: $5,400.00
Issuance Date: 06/03/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/03/2014
Gravity:
Report ID: 1055320
Contest Date: 06/10/2014
Final Order: 07/23/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Y: State Decision | 07/23/2014 | $5,400.00 | 05/03/2014 | Repeat | |
| Penalty | Z: Issued | 06/03/2014 | $5,400.00 | 05/03/2014 | Repeat |
Translate