Violation Detail
Standard Cited: 19100036 G02 Design and construction requirements for exit routes.
Inspection Nr: 317004901
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $875.00
Current Penalty: $875.00
Issuance Date: 07/15/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/19/2013
Gravity: 03
Report ID: 0454510
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
Translate