Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 315635961
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $400.00
Current Penalty: $400.00
Issuance Date: 02/02/2012
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 01/05/2012
Gravity:
Report ID: 1055310
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate