Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 314910738
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $3,825.00
Current Penalty: $2,677.50
Issuance Date: 11/26/2010
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 12/22/2010
Gravity: 05
Report ID: 0729300
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/20/2010 | $2,677.50 | 12/22/2010 | Serious | |
| Penalty | Z: Issued | 11/26/2010 | $3,825.00 | 12/22/2010 | Serious |
Translate