Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 314459124
Citation: 01002
Citation Type: Repeat
Abatement Status: X
Initial Penalty: $600.00
Current Penalty: $600.00
Issuance Date: 07/08/2010
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/08/2010
Gravity:
Report ID: 1055320
Contest Date: 07/13/2010
Final Order: 02/08/2011
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 02/08/2011 | $600.00 | 06/08/2010 | Repeat | |
| Penalty | Z: Issued | 07/08/2010 | $600.00 | 06/08/2010 | Repeat |
Translate