Violation Detail
Standard Cited: 19260251 E08 III Rigging equipment for material handling.
Inspection Nr: 314359027
Citation: 01002
Citation Type: Serious
Abatement Status: I
Initial Penalty: $300.00
Current Penalty: $195.00
Issuance Date: 07/12/2010
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 07/15/2010
Gravity: 02
Report ID: 0551800
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/29/2010 | $195.00 | 07/15/2010 | Serious | |
| Penalty | Z: Issued | 07/12/2010 | $300.00 | 07/15/2010 | Serious |
Translate