Violation Detail
Standard Cited: 19100036 E01 Design and construction requirements for exit routes.
This violation item has been deleted.
Inspection Nr: 313998338
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $2,100.00
Current Penalty: $2,100.00
Issuance Date: 12/03/2009
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/21/2009
Gravity:
Report ID: 0355124
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/29/2009 | $2,100.00 | 12/21/2009 | Serious | |
| Penalty | Z: Issued | 12/03/2009 | $2,100.00 | 12/21/2009 | Serious |
Translate