Violation Detail
Standard Cited: 19100119 D03 IB Process safety management of highly hazardous chemicals.
Inspection Nr: 313720757
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 01/05/2011
Nr Instances: 3
Nr Exposed: 10
Abatement Date: 12/31/2011
Gravity: 10
Report ID: 0830600
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/27/2011 | $7,000.00 | 12/31/2011 | Serious | |
Penalty | Z: Issued | 01/05/2011 | $7,000.00 | 01/28/2011 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard: CHEMNEP
29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include piping and instrument diagrams (P&IDs): a) P&ID identified as FPU/82052, Sheet 322, was not accurate in that the drawing included a valve identified as >"-G-452. b) P&ID identified as FPU/82052, Sheet 322, was not accurate in that the drawing failed to include a pull down located between vessel C20-001 and the recirculating pump connected by ammonia lines identified on the P&ID as 4"-LTRL-32206-XR and 4"-L-12020. c) P&ID identified as FPU/82052, Sheet 322, was not accurate in that the drawing included a pipe that transitioned from 2 inches to 4 inches (2X4) identified as transitioning from 4 inches to 2 inches (4X2). Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Sample Abatement-Certification Letter").