Violation Detail
Standard Cited: 19100119 D03 IB Process safety management of highly hazardous chemicals.
Inspection Nr: 313180424
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,975.00
Current Penalty: $2,082.50
Issuance Date: 10/12/2011
Nr Instances: 2
Nr Exposed: 9
Abatement Date: 10/17/2011
Gravity: 05
Report ID: 0523900
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/19/2011 | $2,082.50 | 10/17/2011 | Serious | |
| Penalty | Z: Issued | 10/12/2011 | $2,975.00 | 10/17/2011 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard: CHEMNEP
29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include the piping and instrument diagrams (P&ID'S): (a)Reboiler E-410B in Distillation Building B; 1.The pressure indicator (PI) near valve V41170 indicated on P&ID 145-PI- 4101 was missing. 2.The pressure indicator (PI) near valve V41176 indicated in P&ID 145-PI- 4101 was missing. Abatement note: Corrected during inspection, employer sent in documentation of abatement.ion