Violation Detail
Standard Cited: 19100119 D03 IB Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 313130833
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,250.00
Current Penalty:
Issuance Date: 04/16/2010
Nr Instances: 5
Nr Exposed: 12
Abatement Date: 04/29/2010
Gravity: 03
Report ID: 0523300
Contest Date: 05/07/2010
Final Order: 09/06/2011
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/06/2011 | 04/29/2010 | Serious | ||
| Penalty | Z: Issued | 04/16/2010 | $2,250.00 | 04/29/2010 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard: CHEMNEP
29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include the piping and instrument diagrams (P&ID'S): The employer did not ensure that the process safety information depicted on the P&IDs was accurate and up-to-date. a) The P&ID provided indicated the presence of two flame arresters, one on the dirty solvent tank, one on the clean solvent tank, which were not present. b) The P&ID provided did not indicate the piping associated with the incoming Ethyl Acetate from the bulk off loading area, and subsequently connecting to the Ink Room. c) The P&ID provided did not include the LEL detector located in the ventilation duct work to the oxidizer that interlocks the controls for operation of the Renzmann Wash Units.nn