Standard Cited: 19100119 D03 IB Process safety management of highly hazardous chemicals.

Inspection Nr: 313008674

Citation: 01002

Citation Type: Serious

Abatement Status: X

Initial Penalty: $4,500.00

Current Penalty: $5,000.00

Issuance Date: 10/13/2009

Nr Instances: 7

Nr Exposed: 23

Abatement Date: 11/06/2009

Gravity: 10

Report ID: 0213900

Contest Date: 10/28/2009

Final Order: 04/22/2010

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty R: Review Commission 04/22/2010 $5,000.00 11/06/2009 Serious  
Penalty Z: Issued 10/13/2009 $4,500.00 11/06/2009 Serious  

Text For Citation: 01 Item/Group: 002 Hazard: REFINERY

29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include piping and instrument diagrams (P&ID'S): a) Nustar Asphalt Refining Co. LLC, Paulsboro facility, Unit 1 - P&ID P-4002-003 was incomplete in that it did not indicate whether a valve on the pilot gas line, PF-644-11/2- C10, would fail open or fail closed. On or about 4/14/09. b) Nustar Asphalt Refining Co. LLC, Paulsboro facility - P&ID P-4002-003 was incomplete in that it did not indicate whether a pressure control valve, PCV-1 on natural gas line, #839A, would fail open or fail closed. On or about 4/14/09. c) Nustar Asphalt Refining Co. LLC, Paulsboro facility, Unit 1 - P&ID P-4002-005 was incomplete in that it did not indicate whether flow valves FCV 72 and FVC 72A on 2" line, AGO from P-406 A/B, would fail open or fail closed. On or about 4/14/09. d) Nustar Asphalt Refining Co. LLC, Paulsboro facility, Unit 1 - P&ID P-4002-006 was incomplete in that it did not indicate whether flow valve FV-401B on line SW-1P1A-1ST- 3/4" would fail open or fail closed. On or about 4/14/09. e) Nustar Asphalt Refining Co. LLC, Paulsboro facility, Unit 1 - P&ID P-4002-007 was incomplete in that it did not indicate whether TV #120 Steam to V403 on 2" line, SH-3"- IH would fail open or fail closed. On or about 4/14/09. f) Nustar Asphalt Refining Co. LLC, Paulsboro facility, Unit 2 - P&ID P-6002-006 was incomplete in that it did not indicate whether pressure control valve, PCV 2, on line FG- 119-3"-C10 would fail open or closed. On or about 4/14/09. g) Nustar Asphalt Refining Co. LLC, Paulsboro facility, Unit 2 - P&ID P-6002-010 was incomplete in that it did not indicate whether TV 360 on line CD-1002-8"-1P1A-IH (Crude flash from D-601 to T-601) would fail open or fail closed. On or about 4/14/09. h) Nustar Asphalt Refining Co. LLC, Paulsboro facility, Unit 2 - P&ID P-6002- 019 was incomplete in that it did not indicate whether the 3" stainless steel globe valve on the atmospheric vent from D-604 (line VG-148-3"-C10) was car sealed open or closed. On or about 4/14/09. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.CE

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.