Standard Cited: 19100119 D03 ID Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 312487457
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $5,000.00
Current Penalty:
Issuance Date: 07/08/2009
Nr Instances: 2
Nr Exposed: 60
Abatement Date: 08/10/2009
Gravity: 10
Report ID: 0317000
Contest Date: 07/28/2009
Final Order: 01/17/2012
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/17/2012 | 08/10/2009 | Serious | ||
Penalty | Z: Issued | 07/08/2009 | $5,000.00 | 08/10/2009 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard: REFINERY
29 CFR 1910.119(d)(3)(i)(D): Process safety information pertaining to the equipment in the process did not include the relief system design and design basis: a) Sunoco Marcus Hook Refinery: The employer's process safety information (PSI) did not include the design and design basis of the relief system for the sphere "Tank SPH-3", as evident by the fact that the employer's PSI provided a relief system design based on pentane for relief valve RV-4731, and identified the physical properties of the relieved material as those associated with pentane. There is no design or design basis to reflect that the vessel and the associated relief valve are utilized in a process to contain or relieve "Light Cat Gas". Observed on or about 5/8/2009. b) Sunoco Marcus Hook Refinery: The employer's process safety information (PSI) did not include the design and design basis of the relief system for sphere "Tank SPH-4", as evident by the fact that the employer's PSI provided a relief system design based on pentane for relief valve RV-4732, and identified the physical properties of the relieved material as those associated with pentane. There is no design or design basis to reflect that the vessel and the associated relief valve are utilized in a process to contain or relieve "Lt St Run" (Light Straight Run Gasoline). Observed on or about 5/8/2009. NOTE: DOCUMENTATION OF ABATEMENT OF THIS CONDITION IS REQUIRED