Violation Detail
Standard Cited: 19100147 C07 IIIA The control of hazardous energy (lockout/tagout).
Inspection Nr: 307738146
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $225.00
Current Penalty: $135.00
Issuance Date: 10/21/2004
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 12/28/2005
Gravity:
Report ID: 0552652
Contest Date: 12/13/2004
Final Order: 12/08/2005
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/08/2005 | $135.00 | 12/28/2005 | Serious | |
| Penalty | A: Amendment | 11/18/2004 | $225.00 | 11/08/2004 | Serious | |
| Penalty | Z: Issued | 10/21/2004 | $225.00 | 11/08/2004 | Serious |
Translate