Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 307429001
Citation: 01002
Citation Type: Repeat
Abatement Status: X
Initial Penalty: $1,600.00
Current Penalty: $1,600.00
Issuance Date: 04/05/2004
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/03/2004
Gravity:
Report ID: 1055310
Contest Date: 04/30/2004
Final Order: 06/22/2004
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Y: State Decision | 06/22/2004 | $1,600.00 | 03/03/2004 | Repeat | |
| Penalty | Z: Issued | 04/05/2004 | $1,600.00 | 03/03/2004 | Repeat |
Translate