Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 307098905
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $150.00
Current Penalty: $150.00
Issuance Date: 01/07/2004
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/12/2003
Gravity:
Report ID: 1055350
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate