Violation Detail
Standard Cited: 19100036 A03 Design and construction requirements for exit routes.
Inspection Nr: 306996596
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $750.00
Current Penalty: $525.00
Issuance Date: 02/18/2004
Nr Instances: 1
Nr Exposed: 75
Abatement Date: 05/22/2004
Gravity: 01
Report ID: 0215000
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/15/2004 | $525.00 | 05/22/2004 | Serious | |
Penalty | Z: Issued | 02/18/2004 | $750.00 | 03/22/2004 | Serious |