Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 304811003
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,050.00
Current Penalty: $1,050.00
Issuance Date: 02/05/2002
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 12/06/2001
Gravity:
Report ID: 1055320
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate