Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 304520570
Citation: 01002
Citation Type: Serious
Abatement Date: 12/21/2001 I
Initial Penalty: $1,250.00
Current Penalty: $400.00
Issuance Date: 12/18/2001
Nr Instances: 1
Nr Exposed: 28
Related Event Code (REC):
Gravity: 03
Report ID: 0215000
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/11/2002 | $400.00 | 12/21/2001 | Serious | |
Penalty | Z: Issued | 12/18/2001 | $1,250.00 | 12/21/2001 | Serious |