Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1859947.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,457.00
Current Penalty: $6,619.90
Issuance Date: 01/23/2026
Nr Instances: 1
Nr Exposed: 40
Abatement Date: 02/12/2026
Gravity: 5
Report ID: 0522500
Contest Date:
Final Order: 04/17/2026
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/17/2026 | $6,619.90 | 02/12/2026 | Serious | |
| Penalty | Z: Issued | 01/23/2026 | $9,457.00 | 02/12/2026 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. a. On or about November 18, 2025, the employer did not ensure that periodic inspections were conducted for the authorized employees at the assembly area finishing line of the facility, who were tasked with performing maintenance and servicing on machines such as, but not limited to, the Solder Robot Machine, SMMS-14575. As a result, employees were exposed to caught-in hazards.
Translate