Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1824350.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $13,240.00
Current Penalty: $0.00
Issuance Date: 08/01/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 08/27/2025
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/27/2025 | $0.00 | Serious | ||
| Penalty | Z: Issued | 08/01/2025 | $13,240.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment was not physically located and operated in such a manner as to isolate the machine or equipment from the energy source: On or about May 7, 2025, the employer did not ensure the electrical energy isolating device (cord and plug) was operated in a manner to isolate the electrical power of a Sheffield C-530 Hot & Cold Automatic Strip Cutting machine, while a CKM (cut, kit, mark) operator performed service and maintenance (unjamming) operations.
Translate