Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1816560.015
Citation: 01002
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/15/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity:
Report ID: 0316400
Contest Date:
Final Order: 05/01/2025
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/01/2025 | $0.00 | Other | ||
| Penalty | Z: Issued | 04/15/2025 | $0.00 | Other |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d)(2): An orderly shutdown of machine or equipment was not utilized to avoid any additional or increased hazards to employees as a result of equipment stoppage: (a) Hospital Basement: On March 20, 2025, employees conduct a monthly test of the generator located in the basement of the hospital. The employer did not ensure employees were notified when equipment, such as the elevators, were shutdown prior to generator testing. No abatement certification or documentation required.